This Feasibility Study was prepared for the extension of Line 1 of the Davao People Mover Project from Bajada Interchange to the Davao International Airport.
Specific deliverables include:
- Complete design criteria;
- Plan and profile of the whole Project;
- Basic results of borehole test surveys and basic design of substructures;
- Preliminary design of all superstructures to include spacing of piers, technology (AASHTO girders, box girders, super T, others);
- Preliminary design of stations;
- Preliminary design of all electro-mechanical components such as rolling stock, signaling, communications, track works, power supply, SCADA, etc.;
- Preliminary construction methodology;
- Bill of quantities (BOQ);
- Environmental and social impact.